Floor Installation

Hardwood and Laminate Flooring Installation – $1.50 sq ft with Free Delivery in GTA

We offer a variety of services including flooring installation, floors repair, re-sanding and refinishing. We strive to offer great service while keeping our rates affordable. Our flooring contractors are highly skilled and courteous when working in your home.

Why choose A Plus Flooring

  • Free Estimates
  • Quality Installations With Warranty
  • Meet or Beat Any Price on Installation
  • Competitive Pricing

12 Month Installation Warranty

The warranty will be void if these products are allowed to acclimate. Prior to installation, the purchaser/installer is solely responsible for determining the acceptability of the moisture levels in both the product and the subfloor.

A+Flooring-Installation

OLD FLOORS REMOVAL

Old hardwood flooring or carpet removal is extra cost, that will include construction disposal bin rental and subfloor repair, if needed.

GET FREE ESTIMATE
Required Fields*

DIY Hardwood and Laminate Flooring Installation Tips

Hardwood Floors Installation Basics

Floors can be installed above or below grade, on concrete slabs, over plywood sub floors, or over existing wood floors. With concrete, moisture control is essential, but can be managed with a film barrier applied directly over the concrete. Engineered wood sub floors must be screwed or nailed in place prior to installation.

Some manufacturers recommend proprietary underlayments that are specially suited to installation of their hardwood floors. Once the sub floor is in place, sanded, smoothed, or filled to provide a level, even surface, installation of the boards can begin. Whether you install the floor using a hammer, a specialized board nailer or stapler, face nail the planks, or glue them to one another, the process of laying out the floor and marking for a square installation is the same.

Here are some tips and tricks for installing a hardwood floor

Most installers begin with the focal point of the room, such as a fireplace, when determining where to begin an installation. Here, border is installed around a bluestone hearth first. Laying decorative borders before the rest of the floor assures that the final installation will be symmetrical.

Before laying the first board, snap a chalk line to use as a reference point. In this installation, a manufacturer’s recommended underlayment is installed over the plywood sub floor. Aligning the first row of boards with the chalk line assures that all subsequent rows will be straight.

Blind nailing tongue-and-groove boards hides the fasteners. Each fastener is driven through one board’s tongue, and covered by the next adjacent board. In other installations, nails are driven through the top of the board, a process called face nailing. Boards can also be glued down, and there are even types with adhesive strips on the back of the flooring.

Important

Do not open immediately! Before opening the packaging, acclimatize flooring boxes for 48 hours by laying each box horizontally and individually in the center of the room, in which they are to be installed. Opened packages should be installed on the same day as opened. Panels should always be carefully examined for faults, straightness and color. Complaints cannot be accepted once the panels have been installed.